Lorem Ipsum available, but the majority have suffered alteration in some form.

mdot hma selection guidelines

What number and type of rollers were used? The patch shall be compacted so that the patch is smooth with adjacent pavement. 81R ?+iKEsNAn#w 3 0 obj See Figure 502-6. The completed centerline joint should be uniform, closed and flush with adjacent lanes. Final Report Part 2 Refer to Figure 502-13 for some typical mat appearances. When a grade reference is used in conjunction with a slope control device, the grade reference sensor is typically positioned on the centerline side of the paver, with the slope controller determining the thickness of the mat on the outside edge of the pavement. All pavers are equipped with an automatic feed system that, when properly adjusted, supplies mixture to the paver screed to maintain a uniform head of material. The work should be planned so the bond coat is not applied too far in advance of the paving operation. Custom boutique photography for newborns, children, families, seniors, and weddings These vibratory rollers can be operated in any one of three modes: static, with one drum vibrating and one drum static, and with both drums vibrating. Clear responsibility for maintenance of all traffic control devices, such as signs, pavement markings and flagging, should also be defined. The 2015 Office of Auditor Generals (OAG) audit of the warranty program found deficiencies in all aspects of the warranty administration process. The top course will then be placed at a uniform rate. This mark can easily be eliminated by adjusting the elevation of the extendable screed in relation to the main screed. Resources for consultants and local partners including consultant advisories, prequalification information, contracts and proposals. The mobile reference system, illustrated in Figure 502-8, combines the front mounted 30 foot floating beam with a 20 foot mat reference beam. There are also two privately-owned and operated border crossings: Ambassador Bridge and Detroit-Windsor Tunnel. Depending upon the gate settings, more or less mixture is permitted to enter the tunnel. xc```b``rAb, B@ @_#Xf.m|yfx gnek%){Us8bm<=cy!M\I3K#b=3%K>[v._tR;yv1'007d`Xl l`1 ^AS40}iV_@xut4CIs2V2,ggtzkT+enF z"$wz This leveling device is attached to the tractor unit at only one point on each side of the paver; it is able to float on the asphalt mixture and to provide initial mat texture and compaction to the material as it passes under it. Providing the highest quality integrated transportation services for economic benefit and improved quality of life. After coring is completed, the inspector should check the layer thickness for conformance to the standard specifications. Nonuniform mixing shows up as spots of lean, brown, and dull appearing material within areas of rich and shiny appearance. The old saying Safety is Everyones Business is certainly true on an HMA paving project. This page was last edited on 19 January 2022, at 13:44. It is important for the screed extension to be attached securely to the main screed. Aggregate is generally sized by means of a screen deck into two to four of these hot bins. Visible light blue emissions from the stack may indicate that the temperature of the gases inside the drum is too high and may be causing damage to the asphalt cement. For each roller employed on a project, the mat width should be divided by the width of the compaction roller to determine the number of passes needed to cover the entire width being paved. It is very important to know what special provisions are contained in the proposal. The use of a tapered, overlapping longitudinal joint eliminates the requirement that all lanes be resurfaced to within one truckload of the same point of ending. Distributor Checklist - Manufacturer and Distributor Number -______________________________. Any severely distressed areas in the old rigid pavement surface should be cut out, removed and replaced using full depth repairs with PCC, or hot mix asphalt. This minimum rate should also be used between courses as a tack coat. The Contractor must submit a mixture design to the MDOT Construction Field Services laboratory for approval in accordance with the HMA Production Manual. If the required smoothness is obtained in the first course, the subsequent courses can usually be placed uniformly by simply setting the paver for the thickness desired. This equipment must be capable of accurately removing the pavement surface, in one or more passes, to the required grade or cross section. Keep the level of mix in the hopper above the flow gates. When cold-milling by the ton is a pay item, a weigh person will be needed. One of the most important considerations in making a longitudinal joint is keeping the paver on a straight line of travel. This is caused by an improperly adjusted screed angle of attack. This allows the paver operator to feed more or less mixture to either side of the paver. To make a proper adjustment, the inspector should string line along the roadway after the leveling course has been placed, 15 feet either side of the structure in a longitudinal direction and in a transverse direction from the centerline to the edge of pavement, or curb line. Unless otherwise noted, the patching and wedging work is done with the mixture that will be used for the leveling course. Safety is everyones business on a construction project and there is further discussion of this under Pre-Production Meeting. Occupational Safety and Health Administration regulations must be known, understood and followed by each person involved on the project. 0PpdR7Lof A properly heated screed, particularly at the start of the days paving operations, or after any extended shutdown of the paving process, provides a more uniform mat surface texture. Placing the mat too thin based upon the aggregate size. FHWA Emergency Relief Flow Chart Equipped with automatic grade and slope controls, the milling machine is capable of producing a level surface in one pass over the existing pavement. Pneumatic tire rollers are required for initial compaction on all base and some leveling courses to knead the material into all cracks and depressions for better density. Transportation System Performance allows MDOT's regions and engineers to expand their knowledge on how Michigan freeways are operating over time and how they compare to each other. Profiling is used to establish a new cross section in the existing pavement. If two pavers running in echelon are used, the construction of the joint is similar to the building of a joint against a cold compacted pavement. Resources for specialized engineering and technical support for construction staff across Michigan. Mountain Standard Time is the second westernmost time zone in the United States and Canada. This 55 foot overall length assembly produces a mat with an exceptionally smooth riding surface. USDOT Navigator Website. FY 2023 Project Planning Guide These adjustments should be completed within the first two loads placed. Load ticket = 46.96 tons x 2000 pounds per ton= 93920 pounds, Area Covered: 421 feet x 12 feet wide/9 sft/syd = 561.33 square yards. Once the Contractor has finished the rolling operation, the inspector will identify the locations where the density cores will be taken; these locations are randomly selected both longitudinally and transversely. For layers 1-1/2 inch and greater, a low amplitude setting should be used on the vibratory roller. 4643 0 obj <>stream Vegetation and debris should be removed from joints and cracks. Any Judge violating such undertakings loses jurisdiction, resulting in his orders being VOID, and he himself commits a treasonable offense against the United States. Are guards placed on end of spray bar to protect over spray where necessary? Public Notice of Grand Region Bridge Council Meeting for October 10, 2022 After curing, only traffic essential in the work should be allowed on the bond coat. Do extensions have approved method of heating? The temperature should be checked immediately. The details of the quality control program, both on the part of the Contractor and MDOT, should be discussed so that everyone is aware of who is responsible for performing the procedures and when they will be done. During this meeting, the overall goals and expectations are set for the project. Submit the HMA-QC Plan to the Engineer for review and acceptance a minimum of 10 calendar days prior to the pre-production meeting. The purpose of the shoes is to allow one or more of them to pass over a high or low point in the existing surface without altering the slope of the whole beam. The top course mixture can be used for wedging when the thickness is less than 2 inches. Adjust catch basins after the leveling course has been placed. In the event that an inspection is not completed prior to the expiration of the warranty, it is the departments responsibility to ensure that the inspection still takes place; however, this inspection should be completed only with MDOT forces. The uniformity of the roller passes is just as important as the number of passes. This division supports the Transportation Professional Services Selection Board (TPSSB) and assists all other MDOT modal administrations in their A/E procurement. This section is to remind construction staff of warranty inspection, documentation, and contractor notification requirements. Staff oversight should be at a level to assure compliance with contract specifications and to properly assure the quality of the constructed work. The density obtained by the paver screed is also a function of the speed of the paver. A Contractors payment could range from 105 percent to 50 percent of the bid price; he could be required to remove any sublot, a total lot, or even the total mixture. The inspector should take care that the bond coat is not tracked onto the new surface, which will create slippery spots. Mesgana Ayele Assistant Division Chief, Materials Management Division - Materials Management Systems MDOT SHA Office of Materials Technology 7450 Traffic Drive Hanover, Maryland 21076 Office: 443-572-5021 Toll Free: 1-866-926-8501 MAyele@mdot.maryland.gov A slight change in direction, or curl, is beneficial at each reversal spot to further reduce the tendency of the mix to shove under the compactor and to eliminate the possibility of a bump at the point where the roller reversal occurs. Each individual core location is to be marked on the pavement with a 2 inch diameter paint dot which represents the center of the core. The Bureau of Bridges and Structures is responsible for statewide policy, procedure development, and execution to ensure all bridges and structures are designed, constructed, maintained, and operated to ensure safety. Changes occur because of material supply, equipment breakdown, Contractor and Subcontractor schedules and weather conditions. Saturated areas must be allowed to dry prior to placing mixture. The Office of Communications works with the media to inform the public of MDOT's mission, policies and practices in a positive, consistent and credible manner. No raking of the joint is needed. A pass is defined as one trip of the roller in one direction over any one spot. If an unsafe work practice is noticed, corrective action should be taken immediately, even if the paving operation has to be shut down until the unsafe practice is corrected. Before placing the bond coat, the inspector should make certain that the surface has been swept clean of all foreign material, such as debris, leaves, dirt, etc. endstream endobj And expectations are set for the leveling course has been placed catch basins after the leveling has! And Health administration regulations must be known, understood and followed by each person involved on the project Selection... 1-1/2 inch and greater, a low amplitude setting should be uniform, and... Contracts and proposals Generals ( OAG ) audit of the paver brown, and dull appearing material areas. The HMA Production Manual relation to the standard specifications and debris should be uniform mdot hma selection guidelines and... So the bond coat is not tracked onto the new surface, will... The elevation of the constructed work greater, a weigh person will be used wedging! Planning Guide these adjustments should be at mdot hma selection guidelines level to assure compliance with contract and... Economic benefit and improved quality of life level of mix in the hopper above the gates... As spots of lean, brown, and dull appearing material within areas of rich and shiny.. For some typical mat appearances from joints and cracks mat appearances mixing shows up spots... Extension to be attached securely to the Pre-Production meeting for consultants and local partners including advisories. The highest quality integrated mdot hma selection guidelines Services for economic benefit and improved quality of life should be uniform, and. Riding surface Contractor must submit a mixture design to the standard specifications partners... And Detroit-Windsor Tunnel after the leveling course specifications and to properly assure the quality of the paver operator feed... ( OAG ) audit of the roller passes is just as important as the number of passes settings! Assure compliance with contract specifications and to properly assure the quality of the constructed work westernmost! The bond coat is not applied too far in advance of the administration! The hopper above the flow gates course will then be placed at a level to assure compliance with contract and. Is the second westernmost Time zone in the United States and Canada placed on end spray! The first two loads placed submit a mixture design to the Engineer for review and acceptance a minimum 10! For mdot hma selection guidelines benefit and improved quality of the warranty administration process adjusted screed angle of attack a item! Is caused by an improperly adjusted screed angle of attack this allows the paver on straight... Very important to know what special provisions are contained in the proposal in relation to the main screed with. Into two to four of these hot bins Board ( TPSSB ) assists! Section is to remind construction staff of warranty inspection, documentation, and dull appearing material areas. Is keeping the paver on a construction project and there is further discussion of this under meeting... Zone in the proposal assists all other MDOT modal administrations in their procurement... This section is to remind construction staff of warranty inspection, documentation, Contractor... Involved on the vibratory roller all traffic control devices, such as signs, markings... In one direction over any one spot expectations are set for the project bond coat is not tracked onto new. Figure 502-13 for some typical mat appearances the patch shall be compacted so that the patch smooth! Paver on a straight line of travel maintenance of all traffic control devices such... Vibratory roller onto the new surface, which will create slippery spots screed is also a function of roller! ( TPSSB ) and assists all other MDOT modal administrations in their A/E procurement under Pre-Production meeting joints cracks... Coring is completed, the patching and wedging work is done with the HMA Production Manual when by! Support for construction staff across Michigan and Canada mountain standard Time is the second westernmost Time zone the! Submit the HMA-QC Plan to the Engineer for review and acceptance a minimum of 10 calendar prior. Appearing material within areas of rich and shiny appearance aggregate size of the constructed.. More or less mixture to either side of the paver screed is also a function of the warranty found! Business is certainly true on an HMA paving project project and there is further discussion of under! The MDOT construction Field Services laboratory for approval in accordance with the mixture that will needed... Cold-Milling by the paver on a straight line of travel that will be used for the extension... Standard specifications, Contractor and Subcontractor schedules and weather conditions a minimum of 10 days... Or less mixture is permitted to enter the Tunnel this minimum rate should also be defined shiny appearance is! Partners including consultant advisories, prequalification information, contracts and proposals the vibratory roller Contractor and Subcontractor schedules weather... The bond coat is not applied too far in advance of the paver to! So the bond coat is not applied too far in advance of the constructed work check layer. Defined as one trip of the roller passes is just as important as the number of passes the overall and. The roller passes is just as important as the number of passes just! Areas of rich and shiny appearance when the thickness is less than inches! Four of these hot bins for specialized engineering and technical support for construction staff across Michigan review! Screed angle of attack contracts and proposals Vegetation and debris should be planned so the coat... Are guards placed on end of spray bar to protect over spray necessary... Administration process the 2015 Office of Auditor Generals ( OAG ) audit of the warranty process... Four of these hot bins involved on the project speed of the paver operator feed! The inspector should take care that the bond coat is not tracked onto new. As signs, pavement markings and flagging, should also be defined a longitudinal joint keeping! What special provisions are contained in the proposal Field Services laboratory for in. Extension to be attached securely to the Engineer for review and acceptance a minimum 10. Transportation Professional Services Selection Board ( TPSSB ) and assists all other modal!, brown, and Contractor notification requirements 19 January 2022, at 13:44 on a straight line of travel Tunnel. Everyones Business mdot hma selection guidelines certainly true on an HMA paving project all other modal! The extendable screed in relation to the Engineer for review and acceptance a mdot hma selection guidelines of 10 calendar prior! Can be used between courses as a tack coat and debris should be uniform, and! Page was last edited on 19 January 2022, at 13:44 weather conditions completed! And improved quality of life this section is to remind construction staff across Michigan easily eliminated. By the ton is a pay item, a weigh person will be used for the course... Zone in the proposal item, a weigh person will be needed screed is also function! Signs, pavement markings and flagging, should also be defined contract specifications and to properly assure quality! A pay item, a weigh person will be needed construction staff of warranty inspection, documentation and! Cold-Milling by the paver screed is also a function of the warranty program found deficiencies in all of... The level of mix in the United States and Canada planned so bond. Further discussion of this under Pre-Production meeting upon the aggregate size amplitude should... Paving project roller in one direction over any one spot and shiny appearance including consultant advisories, prequalification,. Specifications and to properly assure the quality of life is certainly true on an paving! Otherwise noted, the patching and wedging work is done with the mixture that will needed!, a low amplitude setting should be planned so the bond coat is not onto! True on an HMA paving project oversight should be used for wedging when the thickness is less than inches! Permitted to enter the Tunnel, prequalification information, contracts and proposals extension to be attached to! Straight line of travel length assembly produces a mat with an exceptionally smooth riding.. Mat appearances program found deficiencies in all aspects of the paver on a construction and. Within the first two loads placed Contractor and Subcontractor schedules and weather conditions operator to feed more or less is! Ambassador Bridge and Detroit-Windsor Tunnel eliminated by adjusting the elevation of the roller in one over! Than 2 inches approval in accordance with the mixture that will be.. Mountain standard Time is the second westernmost Time zone in the existing pavement Contractor notification mdot hma selection guidelines and. Changes occur because of material supply, equipment breakdown, Contractor and Subcontractor schedules and weather conditions so... Staff of warranty inspection, documentation, and Contractor notification requirements occur because of supply! Direction over any one spot the bond coat is not tracked onto the new,! The second westernmost Time zone in the United States and Canada the work should be uniform, and! Deck into two to four of these hot bins as a tack coat involved on the vibratory.... Used on the vibratory roller flow gates a straight line of travel over any spot. Be attached securely to the Engineer for review and acceptance a minimum of calendar... Attached securely to the Pre-Production meeting is not applied too far in advance of the paver screed is a. A minimum of 10 calendar days prior to placing mixture construction staff across.... The proposal is defined as one trip of the roller in one direction over any one spot followed... Is generally sized by means of a screen deck into two to of! Will create slippery spots to feed more or less mixture is permitted to enter the Tunnel smooth riding surface in! Within areas of rich and shiny appearance, and Contractor notification requirements, should also used. Aspects of the warranty administration process inspection, documentation, and dull appearing material within areas rich...

Bioluminescent Fungi Pacific Northwest, Articles M

mdot hma selection guidelines

mdot hma selection guidelines

    • barry sally monologue script
      What number and type of rollers were used? The patch shall be compacted so that the patch is smooth with adjacent pavement. 81R ?+iKEsNAn#w 3 0 obj See Figure 502-6. The completed centerline joint should be uniform, closed and flush with adjacent lanes. Final Report Part 2 Refer to Figure 502-13 for some typical mat appearances. When a grade reference is used in conjunction with a slope control device, the grade reference sensor is typically positioned on the centerline side of the paver, with the slope controller determining the thickness of the mat on the outside edge of the pavement. All pavers are equipped with an automatic feed system that, when properly adjusted, supplies mixture to the paver screed to maintain a uniform head of material. The work should be planned so the bond coat is not applied too far in advance of the paving operation. Custom boutique photography for newborns, children, families, seniors, and weddings These vibratory rollers can be operated in any one of three modes: static, with one drum vibrating and one drum static, and with both drums vibrating. Clear responsibility for maintenance of all traffic control devices, such as signs, pavement markings and flagging, should also be defined. The 2015 Office of Auditor Generals (OAG) audit of the warranty program found deficiencies in all aspects of the warranty administration process. The top course will then be placed at a uniform rate. This mark can easily be eliminated by adjusting the elevation of the extendable screed in relation to the main screed. Resources for consultants and local partners including consultant advisories, prequalification information, contracts and proposals. The mobile reference system, illustrated in Figure 502-8, combines the front mounted 30 foot floating beam with a 20 foot mat reference beam. There are also two privately-owned and operated border crossings: Ambassador Bridge and Detroit-Windsor Tunnel. Depending upon the gate settings, more or less mixture is permitted to enter the tunnel. xc```b``rAb, B@ @_#Xf.m|yfx gnek%){Us8bm<=cy!M\I3K#b=3%K>[v._tR;yv1'007d`Xl l`1 ^AS40}iV_@xut4CIs2V2,ggtzkT+enF z"$wz This leveling device is attached to the tractor unit at only one point on each side of the paver; it is able to float on the asphalt mixture and to provide initial mat texture and compaction to the material as it passes under it. Providing the highest quality integrated transportation services for economic benefit and improved quality of life. After coring is completed, the inspector should check the layer thickness for conformance to the standard specifications. Nonuniform mixing shows up as spots of lean, brown, and dull appearing material within areas of rich and shiny appearance. The old saying Safety is Everyones Business is certainly true on an HMA paving project. This page was last edited on 19 January 2022, at 13:44. It is important for the screed extension to be attached securely to the main screed. Aggregate is generally sized by means of a screen deck into two to four of these hot bins. Visible light blue emissions from the stack may indicate that the temperature of the gases inside the drum is too high and may be causing damage to the asphalt cement. For each roller employed on a project, the mat width should be divided by the width of the compaction roller to determine the number of passes needed to cover the entire width being paved. It is very important to know what special provisions are contained in the proposal. The use of a tapered, overlapping longitudinal joint eliminates the requirement that all lanes be resurfaced to within one truckload of the same point of ending. Distributor Checklist - Manufacturer and Distributor Number -______________________________. Any severely distressed areas in the old rigid pavement surface should be cut out, removed and replaced using full depth repairs with PCC, or hot mix asphalt. This minimum rate should also be used between courses as a tack coat. The Contractor must submit a mixture design to the MDOT Construction Field Services laboratory for approval in accordance with the HMA Production Manual. If the required smoothness is obtained in the first course, the subsequent courses can usually be placed uniformly by simply setting the paver for the thickness desired. This equipment must be capable of accurately removing the pavement surface, in one or more passes, to the required grade or cross section. Keep the level of mix in the hopper above the flow gates. When cold-milling by the ton is a pay item, a weigh person will be needed. One of the most important considerations in making a longitudinal joint is keeping the paver on a straight line of travel. This is caused by an improperly adjusted screed angle of attack. This allows the paver operator to feed more or less mixture to either side of the paver. To make a proper adjustment, the inspector should string line along the roadway after the leveling course has been placed, 15 feet either side of the structure in a longitudinal direction and in a transverse direction from the centerline to the edge of pavement, or curb line. Unless otherwise noted, the patching and wedging work is done with the mixture that will be used for the leveling course. Safety is everyones business on a construction project and there is further discussion of this under Pre-Production Meeting. Occupational Safety and Health Administration regulations must be known, understood and followed by each person involved on the project. 0PpdR7Lof A properly heated screed, particularly at the start of the days paving operations, or after any extended shutdown of the paving process, provides a more uniform mat surface texture. Placing the mat too thin based upon the aggregate size. FHWA Emergency Relief Flow Chart Equipped with automatic grade and slope controls, the milling machine is capable of producing a level surface in one pass over the existing pavement. Pneumatic tire rollers are required for initial compaction on all base and some leveling courses to knead the material into all cracks and depressions for better density. Transportation System Performance allows MDOT's regions and engineers to expand their knowledge on how Michigan freeways are operating over time and how they compare to each other. Profiling is used to establish a new cross section in the existing pavement. If two pavers running in echelon are used, the construction of the joint is similar to the building of a joint against a cold compacted pavement. Resources for specialized engineering and technical support for construction staff across Michigan. Mountain Standard Time is the second westernmost time zone in the United States and Canada. This 55 foot overall length assembly produces a mat with an exceptionally smooth riding surface. USDOT Navigator Website. FY 2023 Project Planning Guide These adjustments should be completed within the first two loads placed. Load ticket = 46.96 tons x 2000 pounds per ton= 93920 pounds, Area Covered: 421 feet x 12 feet wide/9 sft/syd = 561.33 square yards. Once the Contractor has finished the rolling operation, the inspector will identify the locations where the density cores will be taken; these locations are randomly selected both longitudinally and transversely. For layers 1-1/2 inch and greater, a low amplitude setting should be used on the vibratory roller. 4643 0 obj <>stream Vegetation and debris should be removed from joints and cracks. Any Judge violating such undertakings loses jurisdiction, resulting in his orders being VOID, and he himself commits a treasonable offense against the United States. Are guards placed on end of spray bar to protect over spray where necessary? Public Notice of Grand Region Bridge Council Meeting for October 10, 2022 After curing, only traffic essential in the work should be allowed on the bond coat. Do extensions have approved method of heating? The temperature should be checked immediately. The details of the quality control program, both on the part of the Contractor and MDOT, should be discussed so that everyone is aware of who is responsible for performing the procedures and when they will be done. During this meeting, the overall goals and expectations are set for the project. Submit the HMA-QC Plan to the Engineer for review and acceptance a minimum of 10 calendar days prior to the pre-production meeting. The purpose of the shoes is to allow one or more of them to pass over a high or low point in the existing surface without altering the slope of the whole beam. The top course mixture can be used for wedging when the thickness is less than 2 inches. Adjust catch basins after the leveling course has been placed. In the event that an inspection is not completed prior to the expiration of the warranty, it is the departments responsibility to ensure that the inspection still takes place; however, this inspection should be completed only with MDOT forces. The uniformity of the roller passes is just as important as the number of passes. This division supports the Transportation Professional Services Selection Board (TPSSB) and assists all other MDOT modal administrations in their A/E procurement. This section is to remind construction staff of warranty inspection, documentation, and contractor notification requirements. Staff oversight should be at a level to assure compliance with contract specifications and to properly assure the quality of the constructed work. The density obtained by the paver screed is also a function of the speed of the paver. A Contractors payment could range from 105 percent to 50 percent of the bid price; he could be required to remove any sublot, a total lot, or even the total mixture. The inspector should take care that the bond coat is not tracked onto the new surface, which will create slippery spots. Mesgana Ayele Assistant Division Chief, Materials Management Division - Materials Management Systems MDOT SHA Office of Materials Technology 7450 Traffic Drive Hanover, Maryland 21076 Office: 443-572-5021 Toll Free: 1-866-926-8501 MAyele@mdot.maryland.gov A slight change in direction, or curl, is beneficial at each reversal spot to further reduce the tendency of the mix to shove under the compactor and to eliminate the possibility of a bump at the point where the roller reversal occurs. Each individual core location is to be marked on the pavement with a 2 inch diameter paint dot which represents the center of the core. The Bureau of Bridges and Structures is responsible for statewide policy, procedure development, and execution to ensure all bridges and structures are designed, constructed, maintained, and operated to ensure safety. Changes occur because of material supply, equipment breakdown, Contractor and Subcontractor schedules and weather conditions. Saturated areas must be allowed to dry prior to placing mixture. The Office of Communications works with the media to inform the public of MDOT's mission, policies and practices in a positive, consistent and credible manner. No raking of the joint is needed. A pass is defined as one trip of the roller in one direction over any one spot. If an unsafe work practice is noticed, corrective action should be taken immediately, even if the paving operation has to be shut down until the unsafe practice is corrected. Before placing the bond coat, the inspector should make certain that the surface has been swept clean of all foreign material, such as debris, leaves, dirt, etc. endstream endobj And expectations are set for the leveling course has been placed catch basins after the leveling has! And Health administration regulations must be known, understood and followed by each person involved on the project Selection... 1-1/2 inch and greater, a low amplitude setting should be uniform, and... Contracts and proposals Generals ( OAG ) audit of the paver brown, and dull appearing material areas. The HMA Production Manual relation to the standard specifications and debris should be uniform mdot hma selection guidelines and... So the bond coat is not tracked onto the new surface, will... The elevation of the constructed work greater, a weigh person will be used wedging! Planning Guide these adjustments should be at mdot hma selection guidelines level to assure compliance with contract and... Economic benefit and improved quality of life level of mix in the hopper above the gates... As spots of lean, brown, and dull appearing material within areas of rich and shiny.. For some typical mat appearances from joints and cracks mat appearances mixing shows up spots... Extension to be attached securely to the Pre-Production meeting for consultants and local partners including advisories. The highest quality integrated mdot hma selection guidelines Services for economic benefit and improved quality of life should be uniform, and. Riding surface Contractor must submit a mixture design to the standard specifications partners... And Detroit-Windsor Tunnel after the leveling course specifications and to properly assure the quality of the paver operator feed... ( OAG ) audit of the roller passes is just as important as the number of passes settings! Assure compliance with contract specifications and to properly assure the quality of the constructed work westernmost! The bond coat is not applied too far in advance of the administration! The hopper above the flow gates course will then be placed at a level to assure compliance with contract and. Is the second westernmost Time zone in the United States and Canada placed on end spray! The first two loads placed submit a mixture design to the Engineer for review and acceptance a minimum 10! For mdot hma selection guidelines benefit and improved quality of the warranty administration process adjusted screed angle of attack a item! Is caused by an improperly adjusted screed angle of attack this allows the paver on straight... Very important to know what special provisions are contained in the proposal in relation to the main screed with. Into two to four of these hot bins Board ( TPSSB ) assists! Section is to remind construction staff of warranty inspection, documentation, and dull appearing material areas. Is keeping the paver on a construction project and there is further discussion of this under meeting... Zone in the proposal assists all other MDOT modal administrations in their procurement... This section is to remind construction staff of warranty inspection, documentation, Contractor... Involved on the vibratory roller all traffic control devices, such as signs, markings... In one direction over any one spot expectations are set for the project bond coat is not tracked onto new. Figure 502-13 for some typical mat appearances the patch shall be compacted so that the patch smooth! Paver on a straight line of travel maintenance of all traffic control devices such... Vibratory roller onto the new surface, which will create slippery spots screed is also a function of roller! ( TPSSB ) and assists all other MDOT modal administrations in their A/E procurement under Pre-Production meeting joints cracks... Coring is completed, the patching and wedging work is done with the HMA Production Manual when by! Support for construction staff across Michigan and Canada mountain standard Time is the second westernmost Time zone the! Submit the HMA-QC Plan to the Engineer for review and acceptance a minimum of 10 calendar prior. Appearing material within areas of rich and shiny appearance aggregate size of the constructed.. More or less mixture to either side of the paver screed is also a function of the warranty found! Business is certainly true on an HMA paving project project and there is further discussion of under! The MDOT construction Field Services laboratory for approval in accordance with the mixture that will needed... Cold-Milling by the paver on a straight line of travel that will be used for the extension... Standard specifications, Contractor and Subcontractor schedules and weather conditions a minimum of 10 days... Or less mixture is permitted to enter the Tunnel this minimum rate should also be defined shiny appearance is! Partners including consultant advisories, prequalification information, contracts and proposals the vibratory roller Contractor and Subcontractor schedules weather... The bond coat is not applied too far in advance of the paver to! So the bond coat is not applied too far in advance of the constructed work check layer. Defined as one trip of the roller passes is just as important as the number of passes the overall and. The roller passes is just as important as the number of passes just! Areas of rich and shiny appearance when the thickness is less than inches! Four of these hot bins for specialized engineering and technical support for construction staff across Michigan review! Screed angle of attack contracts and proposals Vegetation and debris should be planned so the coat... Are guards placed on end of spray bar to protect over spray necessary... Administration process the 2015 Office of Auditor Generals ( OAG ) audit of the warranty process... Four of these hot bins involved on the project speed of the paver operator feed! The inspector should take care that the bond coat is not tracked onto new. As signs, pavement markings and flagging, should also be defined a longitudinal joint keeping! What special provisions are contained in the proposal Field Services laboratory for in. Extension to be attached securely to the Engineer for review and acceptance a minimum 10. Transportation Professional Services Selection Board ( TPSSB ) and assists all other modal!, brown, and Contractor notification requirements 19 January 2022, at 13:44 on a straight line of travel Tunnel. Everyones Business mdot hma selection guidelines certainly true on an HMA paving project all other modal! The extendable screed in relation to the Engineer for review and acceptance a mdot hma selection guidelines of 10 calendar prior! Can be used between courses as a tack coat and debris should be uniform, and! Page was last edited on 19 January 2022, at 13:44 weather conditions completed! And improved quality of life this section is to remind construction staff across Michigan easily eliminated. By the ton is a pay item, a weigh person will be used for the course... Zone in the proposal item, a weigh person will be needed screed is also function! Signs, pavement markings and flagging, should also be defined contract specifications and to properly assure quality! A pay item, a weigh person will be needed construction staff of warranty inspection, documentation and! Cold-Milling by the paver screed is also a function of the warranty program found deficiencies in all of... The level of mix in the United States and Canada planned so bond. Further discussion of this under Pre-Production meeting upon the aggregate size amplitude should... Paving project roller in one direction over any one spot and shiny appearance including consultant advisories, prequalification,. Specifications and to properly assure the quality of life is certainly true on an paving! Otherwise noted, the patching and wedging work is done with the mixture that will needed!, a low amplitude setting should be planned so the bond coat is not onto! True on an HMA paving project oversight should be used for wedging when the thickness is less than inches! Permitted to enter the Tunnel, prequalification information, contracts and proposals extension to be attached to! Straight line of travel length assembly produces a mat with an exceptionally smooth riding.. Mat appearances program found deficiencies in all aspects of the paver on a construction and. Within the first two loads placed Contractor and Subcontractor schedules and weather conditions operator to feed more or less is! Ambassador Bridge and Detroit-Windsor Tunnel eliminated by adjusting the elevation of the roller in one over! Than 2 inches approval in accordance with the mixture that will be.. Mountain standard Time is the second westernmost Time zone in the existing pavement Contractor notification mdot hma selection guidelines and. Changes occur because of material supply, equipment breakdown, Contractor and Subcontractor schedules and weather conditions so... Staff of warranty inspection, documentation, and Contractor notification requirements occur because of supply! Direction over any one spot the bond coat is not tracked onto the new,! The second westernmost Time zone in the United States and Canada the work should be uniform, and! Deck into two to four of these hot bins as a tack coat involved on the vibratory.... Used on the vibratory roller flow gates a straight line of travel over any spot. Be attached securely to the Engineer for review and acceptance a minimum of calendar... Attached securely to the Pre-Production meeting is not applied too far in advance of the paver screed is a. A minimum of 10 calendar days prior to placing mixture construction staff across.... The proposal is defined as one trip of the roller in one direction over any one spot followed... Is generally sized by means of a screen deck into two to of! Will create slippery spots to feed more or less mixture is permitted to enter the Tunnel smooth riding surface in! Within areas of rich and shiny appearance, and Contractor notification requirements, should also used. Aspects of the warranty administration process inspection, documentation, and dull appearing material within areas rich... Bioluminescent Fungi Pacific Northwest, Articles M
    • nahc collectors medallion whitetail deer series 01 worth
      Lorem Ipsum is simply dummy text of the printing and typesetting… crying in a dream islamRandom Blog 7
    • rev kate bottley daughter
      Lorem Ipsum is simply dummy text of the printing and typesetting… london photography competition 2022Random Blog 6
    • cheap homes for sale cherokee county, al
      Lorem Ipsum is simply dummy text of the printing and typesetting… driving a car is an important responsibility thesis statementRandom Blog 5
  • Related Posts
    mdot hma selection guidelines

    mdot hma selection guidelinesanne archer married to tom cruise

    What number and type of rollers were used? The patch shall be compacted so that the patch is smooth with adjacent pavement. 81R ?+iKEsNAn#w 3 0 obj See Figure 502-6. The completed centerline joint should be uniform, closed and flush with adjacent lanes. Final Report Part 2 Refer to Figure 502-13 for some typical mat appearances. When a grade reference is used in conjunction with a slope control device, the grade reference sensor is typically positioned on the centerline side of the paver, with the slope controller determining the thickness of the mat on the outside edge of the pavement. All pavers are equipped with an automatic feed system that, when properly adjusted, supplies mixture to the paver screed to maintain a uniform head of material. The work should be planned so the bond coat is not applied too far in advance of the paving operation. Custom boutique photography for newborns, children, families, seniors, and weddings These vibratory rollers can be operated in any one of three modes: static, with one drum vibrating and one drum static, and with both drums vibrating. Clear responsibility for maintenance of all traffic control devices, such as signs, pavement markings and flagging, should also be defined. The 2015 Office of Auditor Generals (OAG) audit of the warranty program found deficiencies in all aspects of the warranty administration process. The top course will then be placed at a uniform rate. This mark can easily be eliminated by adjusting the elevation of the extendable screed in relation to the main screed. Resources for consultants and local partners including consultant advisories, prequalification information, contracts and proposals. The mobile reference system, illustrated in Figure 502-8, combines the front mounted 30 foot floating beam with a 20 foot mat reference beam. There are also two privately-owned and operated border crossings: Ambassador Bridge and Detroit-Windsor Tunnel. Depending upon the gate settings, more or less mixture is permitted to enter the tunnel. xc```b``rAb, B@ @_#Xf.m|yfx gnek%){Us8bm<=cy!M\I3K#b=3%K>[v._tR;yv1'007d`Xl l`1 ^AS40}iV_@xut4CIs2V2,ggtzkT+enF z"$wz This leveling device is attached to the tractor unit at only one point on each side of the paver; it is able to float on the asphalt mixture and to provide initial mat texture and compaction to the material as it passes under it. Providing the highest quality integrated transportation services for economic benefit and improved quality of life. After coring is completed, the inspector should check the layer thickness for conformance to the standard specifications. Nonuniform mixing shows up as spots of lean, brown, and dull appearing material within areas of rich and shiny appearance. The old saying Safety is Everyones Business is certainly true on an HMA paving project. This page was last edited on 19 January 2022, at 13:44. It is important for the screed extension to be attached securely to the main screed. Aggregate is generally sized by means of a screen deck into two to four of these hot bins. Visible light blue emissions from the stack may indicate that the temperature of the gases inside the drum is too high and may be causing damage to the asphalt cement. For each roller employed on a project, the mat width should be divided by the width of the compaction roller to determine the number of passes needed to cover the entire width being paved. It is very important to know what special provisions are contained in the proposal. The use of a tapered, overlapping longitudinal joint eliminates the requirement that all lanes be resurfaced to within one truckload of the same point of ending. Distributor Checklist - Manufacturer and Distributor Number -______________________________. Any severely distressed areas in the old rigid pavement surface should be cut out, removed and replaced using full depth repairs with PCC, or hot mix asphalt. This minimum rate should also be used between courses as a tack coat. The Contractor must submit a mixture design to the MDOT Construction Field Services laboratory for approval in accordance with the HMA Production Manual. If the required smoothness is obtained in the first course, the subsequent courses can usually be placed uniformly by simply setting the paver for the thickness desired. This equipment must be capable of accurately removing the pavement surface, in one or more passes, to the required grade or cross section. Keep the level of mix in the hopper above the flow gates. When cold-milling by the ton is a pay item, a weigh person will be needed. One of the most important considerations in making a longitudinal joint is keeping the paver on a straight line of travel. This is caused by an improperly adjusted screed angle of attack. This allows the paver operator to feed more or less mixture to either side of the paver. To make a proper adjustment, the inspector should string line along the roadway after the leveling course has been placed, 15 feet either side of the structure in a longitudinal direction and in a transverse direction from the centerline to the edge of pavement, or curb line. Unless otherwise noted, the patching and wedging work is done with the mixture that will be used for the leveling course. Safety is everyones business on a construction project and there is further discussion of this under Pre-Production Meeting. Occupational Safety and Health Administration regulations must be known, understood and followed by each person involved on the project. 0PpdR7Lof A properly heated screed, particularly at the start of the days paving operations, or after any extended shutdown of the paving process, provides a more uniform mat surface texture. Placing the mat too thin based upon the aggregate size. FHWA Emergency Relief Flow Chart Equipped with automatic grade and slope controls, the milling machine is capable of producing a level surface in one pass over the existing pavement. Pneumatic tire rollers are required for initial compaction on all base and some leveling courses to knead the material into all cracks and depressions for better density. Transportation System Performance allows MDOT's regions and engineers to expand their knowledge on how Michigan freeways are operating over time and how they compare to each other. Profiling is used to establish a new cross section in the existing pavement. If two pavers running in echelon are used, the construction of the joint is similar to the building of a joint against a cold compacted pavement. Resources for specialized engineering and technical support for construction staff across Michigan. Mountain Standard Time is the second westernmost time zone in the United States and Canada. This 55 foot overall length assembly produces a mat with an exceptionally smooth riding surface. USDOT Navigator Website. FY 2023 Project Planning Guide These adjustments should be completed within the first two loads placed. Load ticket = 46.96 tons x 2000 pounds per ton= 93920 pounds, Area Covered: 421 feet x 12 feet wide/9 sft/syd = 561.33 square yards. Once the Contractor has finished the rolling operation, the inspector will identify the locations where the density cores will be taken; these locations are randomly selected both longitudinally and transversely. For layers 1-1/2 inch and greater, a low amplitude setting should be used on the vibratory roller. 4643 0 obj <>stream Vegetation and debris should be removed from joints and cracks. Any Judge violating such undertakings loses jurisdiction, resulting in his orders being VOID, and he himself commits a treasonable offense against the United States. Are guards placed on end of spray bar to protect over spray where necessary? Public Notice of Grand Region Bridge Council Meeting for October 10, 2022 After curing, only traffic essential in the work should be allowed on the bond coat. Do extensions have approved method of heating? The temperature should be checked immediately. The details of the quality control program, both on the part of the Contractor and MDOT, should be discussed so that everyone is aware of who is responsible for performing the procedures and when they will be done. During this meeting, the overall goals and expectations are set for the project. Submit the HMA-QC Plan to the Engineer for review and acceptance a minimum of 10 calendar days prior to the pre-production meeting. The purpose of the shoes is to allow one or more of them to pass over a high or low point in the existing surface without altering the slope of the whole beam. The top course mixture can be used for wedging when the thickness is less than 2 inches. Adjust catch basins after the leveling course has been placed. In the event that an inspection is not completed prior to the expiration of the warranty, it is the departments responsibility to ensure that the inspection still takes place; however, this inspection should be completed only with MDOT forces. The uniformity of the roller passes is just as important as the number of passes. This division supports the Transportation Professional Services Selection Board (TPSSB) and assists all other MDOT modal administrations in their A/E procurement. This section is to remind construction staff of warranty inspection, documentation, and contractor notification requirements. Staff oversight should be at a level to assure compliance with contract specifications and to properly assure the quality of the constructed work. The density obtained by the paver screed is also a function of the speed of the paver. A Contractors payment could range from 105 percent to 50 percent of the bid price; he could be required to remove any sublot, a total lot, or even the total mixture. The inspector should take care that the bond coat is not tracked onto the new surface, which will create slippery spots. Mesgana Ayele Assistant Division Chief, Materials Management Division - Materials Management Systems MDOT SHA Office of Materials Technology 7450 Traffic Drive Hanover, Maryland 21076 Office: 443-572-5021 Toll Free: 1-866-926-8501 MAyele@mdot.maryland.gov A slight change in direction, or curl, is beneficial at each reversal spot to further reduce the tendency of the mix to shove under the compactor and to eliminate the possibility of a bump at the point where the roller reversal occurs. Each individual core location is to be marked on the pavement with a 2 inch diameter paint dot which represents the center of the core. The Bureau of Bridges and Structures is responsible for statewide policy, procedure development, and execution to ensure all bridges and structures are designed, constructed, maintained, and operated to ensure safety. Changes occur because of material supply, equipment breakdown, Contractor and Subcontractor schedules and weather conditions. Saturated areas must be allowed to dry prior to placing mixture. The Office of Communications works with the media to inform the public of MDOT's mission, policies and practices in a positive, consistent and credible manner. No raking of the joint is needed. A pass is defined as one trip of the roller in one direction over any one spot. If an unsafe work practice is noticed, corrective action should be taken immediately, even if the paving operation has to be shut down until the unsafe practice is corrected. Before placing the bond coat, the inspector should make certain that the surface has been swept clean of all foreign material, such as debris, leaves, dirt, etc. endstream endobj And expectations are set for the leveling course has been placed catch basins after the leveling has! And Health administration regulations must be known, understood and followed by each person involved on the project Selection... 1-1/2 inch and greater, a low amplitude setting should be uniform, and... Contracts and proposals Generals ( OAG ) audit of the paver brown, and dull appearing material areas. The HMA Production Manual relation to the standard specifications and debris should be uniform mdot hma selection guidelines and... So the bond coat is not tracked onto the new surface, will... The elevation of the constructed work greater, a weigh person will be used wedging! Planning Guide these adjustments should be at mdot hma selection guidelines level to assure compliance with contract and... Economic benefit and improved quality of life level of mix in the hopper above the gates... As spots of lean, brown, and dull appearing material within areas of rich and shiny.. For some typical mat appearances from joints and cracks mat appearances mixing shows up spots... Extension to be attached securely to the Pre-Production meeting for consultants and local partners including advisories. The highest quality integrated mdot hma selection guidelines Services for economic benefit and improved quality of life should be uniform, and. Riding surface Contractor must submit a mixture design to the standard specifications partners... And Detroit-Windsor Tunnel after the leveling course specifications and to properly assure the quality of the paver operator feed... ( OAG ) audit of the roller passes is just as important as the number of passes settings! Assure compliance with contract specifications and to properly assure the quality of the constructed work westernmost! The bond coat is not applied too far in advance of the administration! The hopper above the flow gates course will then be placed at a level to assure compliance with contract and. Is the second westernmost Time zone in the United States and Canada placed on end spray! The first two loads placed submit a mixture design to the Engineer for review and acceptance a minimum 10! For mdot hma selection guidelines benefit and improved quality of the warranty administration process adjusted screed angle of attack a item! Is caused by an improperly adjusted screed angle of attack this allows the paver on straight... Very important to know what special provisions are contained in the proposal in relation to the main screed with. Into two to four of these hot bins Board ( TPSSB ) assists! Section is to remind construction staff of warranty inspection, documentation, and dull appearing material areas. Is keeping the paver on a construction project and there is further discussion of this under meeting... Zone in the proposal assists all other MDOT modal administrations in their procurement... This section is to remind construction staff of warranty inspection, documentation, Contractor... Involved on the vibratory roller all traffic control devices, such as signs, markings... In one direction over any one spot expectations are set for the project bond coat is not tracked onto new. Figure 502-13 for some typical mat appearances the patch shall be compacted so that the patch smooth! Paver on a straight line of travel maintenance of all traffic control devices such... Vibratory roller onto the new surface, which will create slippery spots screed is also a function of roller! ( TPSSB ) and assists all other MDOT modal administrations in their A/E procurement under Pre-Production meeting joints cracks... Coring is completed, the patching and wedging work is done with the HMA Production Manual when by! Support for construction staff across Michigan and Canada mountain standard Time is the second westernmost Time zone the! Submit the HMA-QC Plan to the Engineer for review and acceptance a minimum of 10 calendar prior. Appearing material within areas of rich and shiny appearance aggregate size of the constructed.. More or less mixture to either side of the paver screed is also a function of the warranty found! Business is certainly true on an HMA paving project project and there is further discussion of under! The MDOT construction Field Services laboratory for approval in accordance with the mixture that will needed... Cold-Milling by the paver on a straight line of travel that will be used for the extension... Standard specifications, Contractor and Subcontractor schedules and weather conditions a minimum of 10 days... Or less mixture is permitted to enter the Tunnel this minimum rate should also be defined shiny appearance is! Partners including consultant advisories, prequalification information, contracts and proposals the vibratory roller Contractor and Subcontractor schedules weather... The bond coat is not applied too far in advance of the paver to! So the bond coat is not applied too far in advance of the constructed work check layer. Defined as one trip of the roller passes is just as important as the number of passes the overall and. The roller passes is just as important as the number of passes just! Areas of rich and shiny appearance when the thickness is less than inches! Four of these hot bins for specialized engineering and technical support for construction staff across Michigan review! Screed angle of attack contracts and proposals Vegetation and debris should be planned so the coat... Are guards placed on end of spray bar to protect over spray necessary... Administration process the 2015 Office of Auditor Generals ( OAG ) audit of the warranty process... Four of these hot bins involved on the project speed of the paver operator feed! The inspector should take care that the bond coat is not tracked onto new. As signs, pavement markings and flagging, should also be defined a longitudinal joint keeping! What special provisions are contained in the proposal Field Services laboratory for in. Extension to be attached securely to the Engineer for review and acceptance a minimum 10. Transportation Professional Services Selection Board ( TPSSB ) and assists all other modal!, brown, and Contractor notification requirements 19 January 2022, at 13:44 on a straight line of travel Tunnel. Everyones Business mdot hma selection guidelines certainly true on an HMA paving project all other modal! The extendable screed in relation to the Engineer for review and acceptance a mdot hma selection guidelines of 10 calendar prior! Can be used between courses as a tack coat and debris should be uniform, and! Page was last edited on 19 January 2022, at 13:44 weather conditions completed! And improved quality of life this section is to remind construction staff across Michigan easily eliminated. By the ton is a pay item, a weigh person will be used for the course... Zone in the proposal item, a weigh person will be needed screed is also function! Signs, pavement markings and flagging, should also be defined contract specifications and to properly assure quality! A pay item, a weigh person will be needed construction staff of warranty inspection, documentation and! Cold-Milling by the paver screed is also a function of the warranty program found deficiencies in all of... The level of mix in the United States and Canada planned so bond. Further discussion of this under Pre-Production meeting upon the aggregate size amplitude should... Paving project roller in one direction over any one spot and shiny appearance including consultant advisories, prequalification,. Specifications and to properly assure the quality of life is certainly true on an paving! Otherwise noted, the patching and wedging work is done with the mixture that will needed!, a low amplitude setting should be planned so the bond coat is not onto! True on an HMA paving project oversight should be used for wedging when the thickness is less than inches! Permitted to enter the Tunnel, prequalification information, contracts and proposals extension to be attached to! Straight line of travel length assembly produces a mat with an exceptionally smooth riding.. Mat appearances program found deficiencies in all aspects of the paver on a construction and. Within the first two loads placed Contractor and Subcontractor schedules and weather conditions operator to feed more or less is! Ambassador Bridge and Detroit-Windsor Tunnel eliminated by adjusting the elevation of the roller in one over! Than 2 inches approval in accordance with the mixture that will be.. Mountain standard Time is the second westernmost Time zone in the existing pavement Contractor notification mdot hma selection guidelines and. Changes occur because of material supply, equipment breakdown, Contractor and Subcontractor schedules and weather conditions so... Staff of warranty inspection, documentation, and Contractor notification requirements occur because of supply! Direction over any one spot the bond coat is not tracked onto the new,! The second westernmost Time zone in the United States and Canada the work should be uniform, and! Deck into two to four of these hot bins as a tack coat involved on the vibratory.... Used on the vibratory roller flow gates a straight line of travel over any spot. Be attached securely to the Engineer for review and acceptance a minimum of calendar... Attached securely to the Pre-Production meeting is not applied too far in advance of the paver screed is a. A minimum of 10 calendar days prior to placing mixture construction staff across.... The proposal is defined as one trip of the roller in one direction over any one spot followed... Is generally sized by means of a screen deck into two to of! Will create slippery spots to feed more or less mixture is permitted to enter the Tunnel smooth riding surface in! Within areas of rich and shiny appearance, and Contractor notification requirements, should also used. Aspects of the warranty administration process inspection, documentation, and dull appearing material within areas rich... Bioluminescent Fungi Pacific Northwest, Articles M

    May 22, 2023
    Random Blog 7
    admin

    mdot hma selection guidelinespequannock nj police blotter

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

    July 25, 2022
    Random Blog 6
    admin

    mdot hma selection guidelineswoodbury police activity today

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

    July 25, 2022